Hotels · Nashville & Tennessee

Hotel FF&E, Received, Stored and Installed Floor by Floor

From the first vendor shipment to the last guestroom, we receive and check your furniture, fixtures and equipment, hold it in our Smyrna warehouse, and install it when your floors are ready.

Read our reviews on Google

What's included

What We Handle on a Hotel Project

Hire us for the full project or only the phases you need, for an opening or a renovation.

  • Vendor Receiving

    One receiving address for every vendor, with deliveries unloaded and logged at our warehouse.

  • Piece-by-Piece Check

    Every item checked against your FF&E schedule and BOLs, photographed and tagged by area.

  • Warehouse Storage

    Secured storage organized by floor and area until your site is ready.

  • Delivery to Each Floor

    Trucked to site, unloaded and moved by elevator to the right floor and area.

  • Guestroom Installation

    Beds, headboards, case goods, desks and seating assembled, leveled and placed to plan.

  • Lobbies & Common Areas

    Lobby, lounge and common-area furniture placed to the approved floor plan.

Why Messolar

Why Hotel Project Teams Use Messolar

You Know What Arrived

A receiving report after every delivery, with photos and any damage or shortages noted on the BOL.

Freight Off Your Site

Shipments can arrive months ahead without tying up your loading dock or occupied floors.

Time to Fix Problems

A final inventory two weeks before install, so missing or damaged items surface while there is time to act.

A Clear Proposal

Each phase, quantity and rate spelled out in writing, based on your schedule and plans.

How it works

Five Phases, One Team

  1. Step 1

    Receive

    Vendor shipments unloaded at our Smyrna warehouse.

  2. Step 2

    Check

    Every piece checked, photographed and tagged.

  3. Step 3

    Store

    Secured storage, organized by floor and area.

  4. Step 4

    Deliver

    Trucked to site and moved to the right floor.

  5. Step 5

    Install

    Unpacked, assembled, leveled and placed.

FAQ

Hotel FF&E Questions

Can our vendors ship to you before the hotel is ready?

Yes. All vendor shipments can go to our warehouse in Smyrna, TN. We unload, check and tag each delivery and store it until your floors are ready.

How do you keep guestroom furniture organized?

Each piece is tagged by area as it arrives and stored by floor and area, based on your FF&E schedule. It goes back out the same way, so it reaches the right floor and room.

What do you need to quote a hotel project?

Your FF&E schedule, floor plans, target dates, and site conditions such as elevator and loading access. We price each phase in a written proposal.

Can you work around a phased renovation?

Yes. Storage lets us release furniture as each floor becomes available. Tell us your phasing when you request the proposal and we will plan deliveries around it.

Who handles electrical and plumbing?

Your licensed contractors. We handle the furniture, fixtures and equipment. Electrical, plumbing, low-voltage and other licensed trade work is not part of our scope.

Request a proposal

Tell us about your project

  1. 1Tell us about the project and what you need handled.
  2. 2Send your FF&E schedule and floor plans if you have them.
  3. 3We reply with a written proposal, priced phase by phase.
Project type *
What do you need handled?

Moving your home instead? See residential moving

Call UsGet a ProposalText Us